Blow down water treatment plant system for Mofateh steam turbine Power Plant in RO basis
Description: Engineering, Procurement and Construction of RO water treatment unit including carbon and sand filters, water softeners, degasifying tower, cooling tower, RO skid, Transferring pumps, storage tanks, chemical dosing packages, piping network, Instrument and control system, Electrical system containing Mv/Lv panels , cabling , grounding and lighting system and cathodic protection system.
Status
Completed
Registration Date
2015/10/06
Update Date
2016/01/13
Manager
Bakhtar
Regional Electricity Co.
Schedule
Start date: 2009